Dashboard/Verification/Create NBS Project

Create Nature-Based Solution Project

Submit your NBS carbon project for verification. Complete all sections below to initiate the IPCC AFOLU-compliant review process with hybrid multi-framework verification.

A

Project Identity

Basic project and owner information

Step 1 of 5
B

Geospatial & Satellite Data

Upload satellite data — all IPCC AFOLU 5-pool fields will be auto-populated

Step 2 of 5

Upload Satellite Data Package

Upload the data package exported from NBS Geospatial Analysis (ZIP or JSON). All IPCC AFOLU 5-pool carbon stocks and sequestration parameters will be auto-populated.

Vegetation & Remote Sensing Metrics

Automatically extracted from satellite analysis — review and adjust if needed.

IPCC AFOLU 5-Pool Carbon Stocks

Carbon stock per pool derived from satellite analysis (IPCC 2019 Refinement, Tier 2). Values in tCO₂e/ha.

C

NBS Pathway & Carbon Model

Intervention pathway, sequestration rates, and adjustment factors

Step 3 of 5

Pathway & Land Classification

Sequestration Rates (tCO₂e/ha/yr)

Auto-filled from satellite analysis based on selected pathway defaults.

Adjustment Factors & Deductions (%)

Applied sequentially to compute verified net carbon reduction.

Hybrid Verification Parameters (Advanced)

Used by the NBS Hybrid Engine v2 — Regen Network · Collect Earth Online · CarbonPlan · Open MRV · Isometric.

D

Risk Assessment & Documentation

Risk levels and required supporting documents

Step 4 of 5

Data Accuracy Declaration

By submitting this verification form, the project owner declares that all data and supporting documents are accurate and truthful. Any misrepresentation may result in revocation of verification status.

E

Form Completeness Summary

Review your submission before running verification

Step 5 of 5

Form Status

12 required fields missing

14%

Complete

What Happens Next?

1
Project submission and validation
2
Satellite data collection (NDVI, AGB)
3
IPCC AFOLU 5-pool carbon estimation
4
NBS hybrid engine verification
5
Additionality & leakage review
6
Admin approval & credit issuance

Estimated Timeline

NBS project verification typically completes in 5–8 business days from submission.

🗓️Average verification: 7 days
📊Success rate: 97.4%

Need Help?

Check our documentation for guides on NBS pathway selection and carbon calculation.

View Documentation →